12 GW pipeline.Factory-built, plug and play, configured to your load.

AlabamaArkansasArizonaCaliforniaColoradoConnecticutWashington, DCDelawareFloridaGeorgiaIowaIdahoIllinoisIndianaKansasKentuckyLouisianaMassachusettsMarylandMaineMichiganMinnesotaMissouriMississippiMontanaNorth CarolinaNorth DakotaNebraskaNew HampshireNew JerseyNew MexicoNevadaNew YorkOhioOklahomaOregonPennsylvaniaRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUtahVirginiaVermontWashingtonWisconsinWest VirginiaWyoming
States with 1AP projects in development

Three layers, engineered as one.One accountable counterparty, not seven.

Mechanical

Twice the energy per acre.

RaptorMount repowers on your existing trackers. NatureMount follows the terrain on greenfield sites: high density, no heavy civils, no major road upgrades. Our system transforms plant economics and capacity factors.

RaptorMount · NatureMount
Electrical

Eighty percent less energy lost.

The 1AP Silicon Bus puts conversion and storage on one simplified bus, replacing the solar + BESS + interconnection stack. Two times the energy density and eighty percent lower maintenance expense.

Conventional stack vs 1AP Silicon Bus
Software

Self-healing.

One control plane across generation, storage, conversion and load. A fault does not become your outage, because our system routes around it. 99.9% availability, 8+ hours UPS-conditioned.

Fault routed around

Three ways to get power.

Kern County, CA · existing tracker rows

Repower legacy solar

You already hold the land, the permits and the interconnection. We rebuild the plant on top of them: the fastest route to more power there is.

Modeled on a 137 MWac single-axis-tracker plant in Kern County, California, on a 15-year LADWP offtake.
TodayWith 1APChange
Energy to grid282,148 MWh580,000 MWh+106%
Annual capacity factor32.9%63%+91%
Generation per acre672 MWh1,291 MWh+92%
Jack County, TX · wind and solar on one site

Add solar to wind

Your operating wind site becomes near-baseload. Same land, same interconnection, dispatchable output straight through the summer peak.

Modeled on a 110 MWac, 55-turbine wind site in Jack County, Texas. 1AP adds 220 MWdc of solar and 880 MWh of storage.
TodayWith 1APChange
Total clean energy354,747 MWh635,698 MWh+84%
Annual capacity factor36%66%+84%
ERCOT summer-peak CF20%85%+325%
Duval County, TX · NatureMount on terrain

Build new solar + storage

Ground-up and sited to your load. Behind the meter or in front of it. 100MW-scale power in twelve months, configured to your demand curve.

Modeled on a 1,850 MWdc build with 541 MW of 8-hour storage in Duval County, Texas, on a 15-year hyperscaler PPA.
TodayWith 1APChange
Annual production1,071,360 MWh2,433,279 MWh+127%
Annual capacity factor31%57%+84%
Seasonal range20–41%37–76%+85%

Time to Power.Firm, clean, primary power that beats gas and nuclear on cost.

Faster

100MW-scale power in 12 months. Factory built, plug & play deployment. Configure and expand to match load, BTM & FTM.

Better

8+ hour UPS-conditioned power. 99.9% reliability. 2x energy density. Self-healing and data center ready.

Cheaper

80% lower energy loss. 80% lower maintenance expense. Lower LCOE, higher-value power.

1APGas (peaking)New gas (CCGT)US nuclearOther solar + storage
Utilization (capacity factor)50–65% solar
75–95% solar+
10–15%55–65%29–93%20–35%
Reliability (availability)99.9%94–98%85–94%91–93%98%
LCOE ($/MWh)$50–90$149–251$90–120$141–220$50–131
CAPEX ($/MWac at POI)$2–3M$1M$2–3M$5–15M$2–3M
Speed (permit + install)1–2 yrs2–3 yrs5–7 yrs>15 yrs2 yrs

The questions that decide the deal.Bankability, timeline, integration, and who carries the risk.

A repower takes about six months. A new system takes about twelve. Our system is built and tested in a factory and arrives as one connected unit, so field work is assembly rather than construction. Tell us your load, your site and your date, and you'll get a layout, a budget and a schedule.

You get one system, one contract, one commissioning and one service relationship, not seven vendors and warranties to reconcile when performance falls short. Site control, permitting and the interconnection application stay with you or your developer; we design the plant to fit what you hold, and on a repower project we are designing to your existing interconnection. Operations and maintenance run against the whole system under a single agreement rather than component by component.

Faults are isolated, not propagated. In a conventional plant the wiring is combined before it reaches the inverter, so the system knows a fault exists but not where it is, and diagnosis becomes a field search across thousands of connections. We put intelligence at the string level: the plant sees each string on its own, shuts a failing one down, and reconfigures around it. One string is a hundredth of a percent of production. The system keeps running while the repair is scheduled.

Yes. This is the configuration our system was designed for. Power can move from our DC bus straight into your bus bar without touching the grid, which removes conversion stages, removes their losses, and delivers power already conditioned. The grid becomes a resource you draw on, not a dependency you wait for. In practice most sites are hybrid: we carry the large majority of your load, with grid or on-site backup covering the remainder according to local rules.

Tell us your load, your site, and your date.